What is the price of the Basher trough open channel flowmeter | Basher trough matching flowmeter

『Basher trough open channel flowmeter』Related information(v cone flow meter|rotary gas meter|gallon meter|gear meter|metal tube rotameter|glass tube rotameter|nutating disk meter|transit time ultrasonic flow meter|wedge flow meter|pd meters|hydraulic flow meter|ultrasonic water flow meter|water flow meter|air flow meter|magnetic water flow meter|oxygen flow meter|gas flow meter|argon flow meter|air velocity meter|gasoline flow meter|fuel flow meter|ultrasonic water meter|digital water meter|nitrogen flow meter|solid flow meter|Oxygen tank flow meter|digital water flow meter|diesel fuel flow meter|steam flow meter|02 flow meter|compressed air flow meter|oil flow meter|liquid flow meter)

1. Increase knowledge! Calculation principle and construction points of Bacher trough, attached case

Calculation principle and construction points of Bacher trough, attached case Bacher trough calculation principle: Bacher trough is a monitoring device used for open channel flow, which accurately records flow data by controlling water flow and monitoring changes in water surface height. The calculation principle is based on the relationship between the geometric dimensions of the measuring weir and the water flow and liquid level in the channel. The larger the flow in the open channel, the higher the liquid level; The smaller the flow rate, the lower the liquid level. After installing the Bacher trough in the channel, the correspondence between the upstream water level and flow rate mainly depends on the geometric dimensions of the Bacher trough due to the smaller cross-sectional area of the trough compared to the channel. By measuring the liquid level of the water flow in the Bacher tank, and based on the corresponding water level flow relationship of the Bacher tank, the flow rate can be reverse calculated. Structure and size: The shape of the Bachel groove is fixed and must include three parts: the contraction section, the throat section, and the expansion section. Each model of Bacher groove has a fixed standard size, which is related to channel installation and needs to be determined based on the users on-site situation. Usually, the Bacher trough is placed in the middle of the jujube flow process, and an open channel flowmeter needs to be installed on top. The installation dimensions (unit: mm) of commonly used models and specifications of open channel flow meters vary depending on the specific model, bu

Basher trough open channel flowmeter
t all follow the above structural principles. Construction points: Center line coincidence: The center line of the Bacher groove should coincide with the center line of the channel to ensure that the water flow does not deviate when entering the Bacher groove. Free flow state: After the Bacher trough is filled with water, the flow state of the water should be free flow, and the submergence degree should be less than the specified critical submergence degree. Upstream straight section: The upstream of the Bacher trough should have a straight section greater than 5 times the width of the channel, so that the water flow can enter the Bacher trough smoothly, avoiding the impact caused by left and right deviation and channel slope. Firmly installed: The installation of the Bacher groove on the channel should be firm, tightly connected to the channel side wall and bottom, without leakage, ensuring that all water flows through the measuring part (throat section) of the Bacher groove. Project Case: Bacher Slot Construction Project of a certain battery manufacturing enterprise Customer Background: The cooperative customer of this project is a battery manufacturing enterprise headquartered in Zhuhai City, specializing in the research and development, production, and sales of polymer lithium-ion batteries. The products are mainly used in the fields of smartphones, laptops, and tablets. Project plan: Determine the project plan according to customer requirements and relevant environmental regulations. The main purpose of this sewage treatment project is to construct a Babbitt discharge tank for the companys sewage station and install flow meters for the tank construction. Taotao Environmental Protection designs a precise construction

『SILVER Official Website SERVICE』

Copyright2026SILVER E-Commerce
+86 15365082610