
『insertion magnetic flow meter|water flow meter』Related information(v cone flow meter|rotary gas meter|gallon meter|gear meter|metal tube rotameter|glass tube rotameter|nutating disk meter|transit time ultrasonic flow meter|wedge flow meter|pd meters|hydraulic flow meter|ultrasonic water flow meter|water flow meter|air flow meter|magnetic water flow meter|oxygen flow meter|gas flow meter|argon flow meter|air velocity meter|gasoline flow meter|fuel flow meter|ultrasonic water meter|digital water meter|nitrogen flow meter|solid flow meter|Oxygen tank flow meter|digital water flow meter|diesel fuel flow meter|steam flow meter|02 flow meter|compressed air flow meter|oil flow meter|liquid flow meter)

What are the professional terms in quality management?
3 MFG Manufacturing Production Control 3-1 DL Director Labor Direct Labor 3-2 IDL Indirect Labor Indirect Labor 3-3 DLH Direct Labor Hours Direct Labor 3-4 Productivity=UTS/DLH 3-5 PPH Pieces Per Hour 3-6 Efficiency=Actual/Target (%) 3-7 DT Machine Down Time 3-8 AI Auto Insertion 3-9 MI Manual Insertion Manual Insertion 3-10 SMD Surface Mount Device Surface Adhesive Parts SMT Surface Mount Technology 3-11 B/I Burn In (for how many hours) rs at how many degrees) Equipment Utilization 3-13 WI Work Instruction Work Instructions 3-14 SOP standard operation procedure operation manual 3-15 R/I run in machine operation 3-16 ESD electrical static discharge 3-17 MP mass production 3-18 EMC Electro Magnetic Compatibility, electromagnetic compatibility 3-19 EMI Electro Magnetic Interference, electromagnetic interference 3-19 SIR Surface Impedance Resistance surface impedance testing 4 Engineer Engineering 4-1 PE Products Engineer; Product Engineering Process Engineer 4-2 TE Test Engineer Test Engineer 4-3 ME Manufacturing Engineer; Manufacturing Engineering Mechanical Engineer 4-4 IE Industrial Engineer Industrial Engineering 4-5 DCC Document Control Center Document Management Center 4-6 BOM Bill Of Material List 4-7 ECN Engineering Change Notice 4-8 TECN Temporary Engineering Change Notice 4-9 ATY Assembly Test Yield Total Yield Direct Rate 4-10 TPM Total Productivity Maintenance 4-11 PM Product Manager; Project Manager Product Manager; Project Manager 4-12 ECR engineering change request 4-13 ECO engineering change order Engineering change instruction 4-14 EN engineering notice Engineering notice 4-15 WPS work procedure sheet Operating instructions 4-16 ICT in circ


Current position > Product detail